11 Strategies · 29 Reference Files · 3-Phase AI Pipeline

Every entitlement strategy.
One address.

Type an address. Get a professional 20-page feasibility report evaluating CHIP, TOC, AB 1287, AB 2334, SB 79, AB 2011 and every applicable California housing incentive — in minutes, not weeks.

Traditional consultant:1–2 weeks
AIEntitle AI:~8 minutes
0Strategies evaluated
0Reference files (ordinance math)
0 minAverage report time
0+Feasibility reports delivered
Strategy Engine

0 strategies. Evaluated simultaneously.

Most consultants check 2–3 programs. Our AI evaluates every applicable California entitlement strategy in parallel — density bonus, FAR, affordability, parking, setbacks — for every viable path.

S1

By-Right

Base zoning — what you can build today with no bonuses or incentives.

S2

AB 1287

State 100% density bonus law — doubles your allowable units.

S3

AB 2334

Low VMT areas with unlimited density — no unit cap.

S4

TOC / SDB

CHIP Transit-Oriented Communities — up to 100% density bonus near transit.

S5

CHIP TOIA

Mixed-Income incentives with transit proximity bonuses.

S6

CHIP OC

Mixed-Income Opportunity Corridors — targeted commercial corridor bonuses.

S7

CHIP AHIP

100% affordable housing — maximum incentive package available.

S8

CHIP CT

Community Transition area bonuses for qualifying neighborhoods.

S9

ED 1

Executive Directive (historical) — suspended since November 2025.

S10

SB 79

Transit-oriented: FAR 2.50, 80 du/acre. Standalone — supersedes base zoning, cannot stack with CHIP or density bonuses.

S11

AB 2011

Ministerial housing on commercial sites — no discretionary review needed.

Every strategy computes: density bonus % · max units · FAR · affordability requirements · parking relief · setback reductions · buildable area · unit mix

3-Phase Pipeline

Address in. Report out.

Type a property address. Six specialized AI agents coordinate across three phases to deliver a professional feasibility report — the same quality a senior land-use consultant produces, in a fraction of the time.

01
01
~2 min

Data Gathering

Three parallel agents pull property data from ZIMAS — zoning, lot dimensions, overlays, hazards, transit proximity, street classifications, and assessor records.

  • ZIMAS API integration
  • LA County Assessor data
  • Transit proximity calculation
  • Street dedication analysis
02
02
~4 min

Strategy Evaluation

Nine+ strategy evaluators run simultaneously — computing density bonus, FAR, affordability thresholds, setback reductions, parking relief, and unit mix for every applicable program.

  • Density bonus formulas
  • FAR calculations
  • Affordability thresholds
  • Parking & setback relief
03
03
~2 min

Report Generation

Final assembly produces a professional 20-page feasibility report comparing all viable strategies with unit counts, buildable area, and development recommendations.

  • Strategy comparison matrix
  • Unit mix optimization
  • Financial modeling
  • PDF export ready
6 AI Agents
29 Reference Files
12–15 Tool Calls Total

Watch the pipeline in action

See five specialized agents collaborate in real-time — from address lookup to final report.

5420 Wilshire Blvd, Los Angeles, CA 90036
feasibility-report.pdf20 pages
Agent Activity0 events
California Programs

Every incentive. Always current.

Built on the actual ordinance math — not estimates. Our reference files encode CHIP Ordinance 188,477, Gov Code § 65915, LAMC code sections, and every applicable state bill.

CHIP

Citywide Housing Incentive Program

Ordinance No. 188,477LAMC 12.22 A.37–A.39Eff. Feb 11, 2025

LA City's unified incentive framework replacing legacy TOC/density bonus. Three sub-programs: SDB/TOC (A.37), MIIP (A.38), AHIP (A.39).

State Density Bonus

California Government Code § 65915

AB 1287 / AB 2334Gov. Code § 65915Eff. Ongoing

State law granting up to 100% density bonus for qualifying affordable housing. AB 1287 (100% bonus), AB 2334 (unlimited density in low VMT areas).

SB 79

Transit-Oriented Housing

Senate Bill 79Gov. Code § 65913.5Eff. 2024

Statewide transit-oriented development: FAR 2.50, 80 du/acre within ½ mile of major transit. Ministerial approval path.

AB 2011

Affordable Housing on Commercial Land

Assembly Bill 2011Gov. Code § 65912.100Eff. 2023

Build housing on commercial-zoned sites with ministerial (by-right) approval. No discretionary review, no CEQA. Major pathway for underused commercial corridors.

Report Output

What consultants charge $5K–$15K for.

A professional-grade feasibility report matching the format senior land-use consultants deliver — except it arrives in 8 minutes instead of 2 weeks.

Property & Zoning Profile

Lot dimensions, zone classification, overlays, specific plans, Q conditions, all pulled automatically from ZIMAS.

Strategy Comparison Matrix

Side-by-side comparison of all viable strategies — max units, density bonus %, FAR, parking ratio, setbacks.

Density & FAR Calculations

Precise density bonus formulas per CHIP Ord. 188,477 and Gov Code § 65915. MARD rounding rules applied.

Affordability Requirements

Exact VLI/LI/Moderate unit counts per strategy. Deed restriction terms. Rent limits from LAHD schedules.

Transit & Location Analysis

Distance to major/local transit stops. TOC tier determination. VMT analysis for AB 2334 eligibility.

20-Page PDF Export

Professional report ready for investor review, lender packages, or internal decision-making. Download as PDF.

Know what you can build
before you spend a dollar.

Pre-development intelligence that covers every incentive program, every density bonus, every California housing pathway — from one address.